EARNED VALUE ANALYSIS TERHADAP BIAYA WAKTU PADA PROYEK PEMBANGUNAN GEDUNG STUDI KASUS PROYEK PEMBANGUNAN GEDUNG PEMBELAJARAN MUHAMMADIYAH KOTA SAMARINDA
DOI:
https://doi.org/10.46306/vierendeel.v2i1.283Keywords:
Earned Value Method, Cost and Time Control, Variance Analysis, Performance Index Analysis.Abstract
Control in the Muhammadiyah Learning Building Project in Samarinda City, East Kalimantan, still uses a traditional concept that only analyzes variances and schedules separately, thus failing to identify performance issues within ongoing activities. Therefore, a project control system utilizing appropriate methods is needed to effectively and efficiently control the project. The method used to evaluate this project is the earned value method, which involves distributing questionnaires to contractors involved and those experienced in project management, assisted by Microsoft Office Excel. The earned value method includes three indicators: planned value, earned value, and actual cost. Variance analysis, performance index analysis, and cost and project completion time estimates are also used to identify any discrepancies between costs and time. This allows for cost and time control measures. The analysis results from June 2017 to October 2017 showed that the work was behind schedule. Meanwhile, for the first week of June 2017 to September 2017, the cost was higher than the budget, while for the second week of September 2017 to October 2017, the cost was lower than the budget.
Downloads
References
Abduh Muhammad, et al., Konsep Earned Value untuk Pengelolaan Proyek Konstruksi, Bandung.
Bulo M. W. L., et al., 2013 Pengaplikasian Metode Earned Value Pada Pengendalian Waktu Terhadap Biaya (Study Kasus: Proyek Penggantian Jembatan Sungai Langkolome Cs Kabupaten Muna), Jurnal Stabilita Vol. 1 No. 3.
Fleming, Q.W. and Koppelman, J.M., 1994. The Essence and Evolution of Earned Value. AACE Transactions.
Lubis S. A. Azhari, 2016, Aplikasi Metode Earned Value Terhadap Evaluasi Kinerja Biaya Dan Waktu Pada Proyek (Jembatan Ruas Tarungin – Asam Randah (46) Kecamatan Hatungun Kabupaten Tapin), Banjarmasin.
Manajemen Proyek Indonesia, Strategi Percepatan Waktu Pelaksanaan Proyek Konstruksi, http://manajemenproyekindonesia.com/?p=472 (diakses 2 Februari 2017)
Prastyono H. Galih, 2010, Earned Value Analysis Terhadap Waktu Pada Proyek Pembangunan Gedung (Studi kasus Proyek Pembangunan Gedung C Fakultas MIPA UNS), Surakarta.
PMBOK guide (A Guide to the Project Management Body of Knowledge). 2004. Third Edition.
Soeharto, Iman, 1995, Manajemen Proyek Dari Konseptual Sampai Operasional, Erlangga, Jakarta.
Sudarsana D. Ketut, 2008, Pengendalian Biaya dan Jadual Terpadu Pada Proyek Konstruksi, Jurnal Ilmiah Teknik Sipil Vol. 12, No. 2.
Yuliana Candra, 2013, Analisis Faktor Penyebab Terjadinya Keterlambatan Pada Pelaksanaan Proyek Pembangunan Jembatan, Info Teknik Vol. 14, No.2
PT.Mitra Agung Manunggal, 2017, Proyek Pembangunan Gedung Pembelajaran Muhammadiyah Kota Samarinda
Downloads
Published
How to Cite
Issue
Section
License
Copyright (c) 2025 Muhammad Nabil Asrar

This work is licensed under a Creative Commons Attribution-NonCommercial-ShareAlike 4.0 International License.